ON THE CONSTRUCTION OF HSIN-TA LNG TERMINAL IN TAIWAN
PDF

Keywords

Taiwan
Hsin-Ta terminal
LNG terminal
terminal construction

How to Cite

Lai, S.- sheng P., & Lee, C.- shiun. (1986). ON THE CONSTRUCTION OF HSIN-TA LNG TERMINAL IN TAIWAN. Coastal Engineering Proceedings, 1(20), 189. https://doi.org/10.9753/icce.v20.189

Abstract

Since 1984 Hsin-Ta LNG Terminal has been under construction for the purpose of importing liquefied natural gas because of increasing demand and possible depletion of natural gas in Taiwan. Several alternatives were taken into account during the feasibility study. The Terminal is built with only a southern breakwater due to its good natural coastal conditions. Each construction item has been coordinated closely in order to advance the schedule. The first phase of land reclamation was finished by 1986. Three tanks have been under construction since soil improvement was finished. The entire project will be completed in 1989.
https://doi.org/10.9753/icce.v20.189
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.