OPTIMIZING DUMPING SITES NEAR DREDGED CHANNELS
PDF

Keywords

dredged channel
dumping site
optimized dumping

How to Cite

Kogel, U., & Ohlmeyer, F. (1984). OPTIMIZING DUMPING SITES NEAR DREDGED CHANNELS. Coastal Engineering Proceedings, 1(19), 211. https://doi.org/10.9753/icce.v19.211

Abstract

To maintain the depth of the deepwater channel of the Elbe-Waterway extensive dredging has to be done permanently. Dumping should be optimized, choosing sites near the dredging area but with a small risk of recirculation of the dumped material. In order to estimate this risk field measurements with current meters and radioactive tracer tests in field and model were carried out.
https://doi.org/10.9753/icce.v19.211
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.