SUBSTRUCTURE DESIGN OF THE NEW MYSTIC PIER NO. 1, BOSTON
PDF

Keywords

pier design
pier construction
Boston
Massachusetts

How to Cite

Seed, H. B. (1952). SUBSTRUCTURE DESIGN OF THE NEW MYSTIC PIER NO. 1, BOSTON. Coastal Engineering Proceedings, 1(3), 16. https://doi.org/10.9753/icce.v3.16

Abstract

In order to provide adequate modern terminal facilities to handle the anticipated commerce requirements, the Port of Boston Authority, in 1947 prepared a master plan for the future development of the port. The second step of this plan was the reconstruction, on modern standards, of the old Mystic Pier No. 1. Planning for this work was started in 1949 and the new pier was opened to commerce in September 1952.
https://doi.org/10.9753/icce.v3.16
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.