THE RESEARCH OF REGULATION MEASURES ON BRAIDED CHANNEL IN YALU RIVER ESTUARY
Proceedings of the 32nd International Conference
PDF

Supplementary Files

Full Manuscript

Keywords

Yalu River estuary
braided channel
regulation measures
research

How to Cite

Cao, Y., Zheng, B., Sun, L., & Gao, F. (2011). THE RESEARCH OF REGULATION MEASURES ON BRAIDED CHANNEL IN YALU RIVER ESTUARY. Coastal Engineering Proceedings, 1(32), posters.5. https://doi.org/10.9753/icce.v32.posters.5

Abstract

By analyzing nature condition of Yalu River estuary part and many domestic and overseas rivers esturary regulation experience,the regulation principles are put forward and the regulation aim is confirmed according to the requirement of west project of china. By numerical model, the regulation measures on baided channel in Yalu River Estuary have been studied. Two measures are recommended by the research.One which is single dredging way,can be as the 1st stage regulation measure;the other measure which is mixed way of regulation and dredging way,can be as the 2nd stage regulation measure.
https://doi.org/10.9753/icce.v32.posters.5
PDF
Authors retain copyright and grant the Proceedings right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this Proceedings.