DESIGN AND CONSTRUCTION OF PLEASURE CRAFT HARBOUR - CLUB MYKONOS LANGEBAAN

D.E. Bosman, G. de F. Retief, J.F. Kapp, M. Kloos, A.B. Ridge

Abstract


A description of the pre-design investigation, design and construction of a pleasure craft harbour is given. The influence of the breakwaters on the sedimentation pattern in the direct vicinity of the harbour during construction and after completion of the harbour is described. Adaption of the design of some of the harbour components due to unforeseen circumstances revealed during the construction period is also discussed.

Keywords


harbor; pleasure craft harbor; case study; Clum Mykonos Langebaan